New Haven-Hartford-Springfield (NHHS) Line - Double tracking 8/24/2009 1A Installation of 10.5 miles of new track between Meriden and Berlin on the NHHS Line - Includes signal and grade crossing work. Provides double track segment extension in critical section of NHHS line to increase line capacity for designated HSP corridor.
Project Total $58,725,000 Federal $$ Requested $41,105,500

New Haven-Hartford-Springfield (NHHS) Line - Double tracking 8/24/2009 1B Preliminary Engineering and the NEPA documentation for double tracking the entire NHHS corridor. In conjunction with 1A application listed above. Includes other associated ROW work (signal, interlocking, grade crossing, bridge repair).
Project Total $9,300,000 Federal $$ Requested $9,300,000

New Haven Line (NHL) Signal and Positive Train Control (PTC) systems 8/24/2009 1B Preliminary Engineering and the NEPA documentation for designing new signal system (inlcluding PTC) on the NHL (part of the NEC). Existing signal system requires replacement. New signal system will increase capacity and MAS on NHL.
Project Total $13,483,582 Federal $$ Requested $13,483,582

Shore Line East (SLE) Stations - North side platforms, pedestrian overpasses, parking improvements (includes new Westbrook station) 8/24/2009 1B Completes preliminary engineering and NEPA documentation for this project (CT has previously committed state funds for this project). Currently, there are single-sided station platforms on the south side. Double-sided station platforms will reduce congestion.
Project Total $300,000 Federal $$ Requested $300,000

Reestablish 4th Track (Track 3) between New Haven and Devon on New Haven Line (NHL) 8/24/2009 1B Completes preliminary engineering and NEPA documentation for this project (CT has previously committed state funds for this project). Reestablishes 4-track NHL main line section on critical NEC segment to increase capacity and reduce congestioon.

Project Total Approx $600,000 Federal $$ Requested $600,000


Total CT $82,408,582 Federal Share $64,789,082